Fibre Optic Network Installation & Testing

AYT Infrastructure designs and installs fibre optic backbones and high-density interconnects across the UK — from campus links to data centre cross-connects, fully spliced, tested and trace-documented.

What we install

  • OM3 / OM4 / OM5 multimode fibre
  • OS1 / OS2 singlemode fibre
  • Mechanical & fusion splicing
  • OTDR testing & trace reports
  • LC, SC, MPO/MTP termination
  • Blown fibre (microduct) systems
  • Armoured external fibre
  • Fibre patch panel & enclosure installation

Our process

  1. Survey & Design
  2. Containment & First Fix
  3. Cable Pull & Splicing
  4. OTDR Test & Certification
  5. Documentation & Handover

Frequently Asked Questions

Do you provide OTDR trace reports? +

Yes. All fibre links are tested and we provide OTDR traces and insertion-loss results as standard, included in the handover documentation pack.

Can you splice both single-mode and multi-mode fibre? +

We carry out both mechanical and fusion splicing across OS1/OS2 single-mode and OM3/OM4/OM5 multi-mode, including LC, SC and MPO/MTP terminations.

Do you install external and armoured fibre? +

Yes — we install armoured external fibre and blown-fibre (microduct) systems for inter-building backbones as well as internal data centre interconnects.

Ready to Start Your Project?

Whether you need a single floor cabled or a full data centre fit-out, we'd like to hear from you.

Typically respond within 4 business hours.